|
|
|
Betty Niermann & Stephen White installing the connections at the waterline
|
|
|
|
Using the trenching machine to dig the run for the pipeline
|
|
|
|
Laying the pipes for the water feed
|
|
|
|
Putting in the pipeline
|
|
|
|
The crew rests in the shade on a 100+ degree day
|
|
|
|
|
The little guys check out the pipeline
|
|
|
|
Thanks to Joe Keating for the bulldozer work - so much dirt to move!
|
|
|
|
Joe gives Peter a ride on the bulldozer
|
|
|
|
Mark works on the line
|
|
|
|
Betty adds the marker pipes
|
|
|
|
|
Almost ready for sod!
|
|
|